The short answer: You keep downtime low by planning the move before anything is unbolted — sequencing the work, prepping machines ahead of time, and doing the heavy lifts on nights or weekends so production barely pauses. Moving heavy machinery is a disconnect-rig-transport-set-level-reconnect process, and every step is planned to protect your uptime.
A production machine isn’t a desk. It has to come off its foundation, travel without damage, and go back dead-level and aligned to the manufacturer’s tolerance, or it runs rough and wears out early. That takes rigging gear, millwright skill, and a plan — not just a truck and a dolly.
Manufacturers, fabricators, printers, food and beverage plants, pharma and medical-device makers, and any facility relocating a single machine, a full line, or an entire plant.
How much does it cost?
Per job — the number and size of machines, the rigging, distance, and the schedule all factor in. Seasonal rates may vary.
How long will my line be down?
As little as the plan allows — often a weekend or a planned shutdown for a single machine; larger moves are phased.
Can you phase the move so we keep running?
Yes — many moves run over weekends or in stages so production stays partly live.
Do you disconnect and reconnect the equipment?
Yes — our millwrights handle teardown, reassembly, leveling, alignment, and utility hookup coordination.